How long does a concrete slab take to cure before I can build on it?
I generally tell people to allow a minimum of 7 days before any light loading, and 28 days before frames go up or heavy work begins. In the Tweed Heads summer, the heat and humidity can actually accelerate surface drying — but that’s not the same as curing, and rushing it is one of the most common ways slabs get damaged early. We keep the slab covered and moist during the curing period to protect the finish and strength development. Don’t let anyone tell you it’s ready before those 28 days are up.