Reinforcement placement is where footing construction either meets the structural engineering documentation, or it doesn’t. Bar diameter, spacing, lap lengths, and concrete cover dimensions are all specified for a reason — they determine how the footing performs under load, and how it holds up over time in the local soil and groundwater environment. We place reinforcement on the approved structural drawings on every project, with cover blocks positioned correctly before the pour proceeds.
Concrete mix specification is equally consequential. The Tweed Heads region’s coastal groundwater conditions and reactive clay profiles in areas toward Murwillumbah place real demands on mix design — sulphate exposure, chloride content, and minimum compressive strength requirements all factor into the specification. We work from the structural engineer’s mix requirements as standard, sourcing concrete from local suppliers to the correct grade, ensuring that what goes into the ground performs exactly as the documentation requires it to.